Annual account: year ended 31 October 2026. Later source checks and publication work do not extend the reporting period.

Harvest reader

Harvest 2026: evidence notes

Annual account: year ended 31 October 2026. Editing, source checks and production after that date do not extend the reporting period.

Reader-facing evidence descriptions. SHA-256 values identify inspected artifact bytes; hashes do not independently validate a claim. Private materials are not published.

E01 · Astrolabe: what rendered and what remained to test

May 2026 device-test history reports flashing, asset upload, a serial capture and a 40-face tour. Retained framebuffer captures are reproduced in the case study. Later input-path findings limit the claim to the tested route. Private histories are retained locally; no transcript or device address is published.

Retained clock capture Retained lunar capture

E02 · Course transport and course quality

Populi import + critical course review, 9 September 2026: Import result; Defect found and fixed during import; Findings 1-3. Four imports succeeded. A web-link serialization repair is documented separately from historical findings of templated lectures, omitted prose/labs/rubrics and figure overflow. The earlier failure cause is not established. Later handoff histories discuss lab links and unfinished submission/access tasks. These records do not certify current course quality or learner outcomes.

E03 · Astrarium: reconstruction, reference and projection

Observation validation describes calibrated FITS products, WCS projection, source metadata and display-only stretching. The retained M16 comparison uses a NASA / ESA Hubble reference mirrored to the east-right view. October projector-test history separately reports a Phoenix replay with 453 one-second SPICE samples; it is historical self-reported test evidence, not a new physical test.

Public Astrarium source Retained M16 comparison

E04 · Emojinq: artifacts and recognition claims

The Emojinq project and original alphabet predate year-end. Working-tree glyph changes and recognition documents inspected in November are later review material, not proof of completed results by 31 October. Human recognition, device deployment and engraving acceptance remain unestablished. No OpenMoji-derived glyph artwork is reproduced; its CC BY-SA 4.0 limits remain distinct.

Public Emojinq source

E05 · Publishing: functioning machinery and separate release gates

The 4 September iNQ Epic POD readiness matrix separates edition approval from rendering and fulfillment components. Orchard build, preflight and release scripts used to prepare Harvest after year-end are publication machinery, not annual achievements. Neither establishes a physical proof or current checkout.

E06 · Mynah and Picard: year-end evidence limits

The annual results close on 31 October. Later handset installations, voice timing measurements and configuration checks are excluded. The retained year-end material does not establish a complete, accepted Faculty-and-Al encounter on the flip phone. The entry keeps that encounter as a direction for 2027, not a demonstrated result of the closed year.

E07 · Reliquary: repair and incomplete voice acceptance

Pre-year-end prototype and repository records establish work on the instrument. Later repair and voice-test records are excluded from the annual result. A complete, dependable voice encounter is not established at the 31 October cutoff.

E08 · LunaSay: demonstrated media within a larger instrument

Retained generation and display-copy history describes a 480-by-480 narrated lunar MP4 using USNO data and a NASA surface map. Orientation, libration and terrain-shadow limitations were disclosed. Copying a file establishes neither playback nor acceptance of the complete round-device experience.

E09 · Portfolio scope and remaining judgments

A later preparation review screened indexed sessions and repositories, combining extraction, selected closer reading and artifact checks. Its inventory totals are not year-end activity counts. Only results through 31 October belong to the annual account. This was not exhaustive manual reading, a code audit or a fresh physical test. Faculty credits are cumulative associations, not a count of contributions made in this year.

Visual revision

48 distinct work plates combine five new AI-generated concept studies, retained specimens and editorial diagrams. A new interpretive Douglas Adams portrait replaces the generic prior image. Concept art and diagrams do not certify manufacture or integration.

R&D catalog revision

The revised edition distinguishes foundational texts, institutional context, research, internal capabilities and potential offerings. Buyer, market and competitor framing applies only where a product or service is proposed. Internal references explain build-or-buy decisions. Twenty-four AI scenes illustrate possible uses; they are not customer trials. Official comparison sources and limits accompany the entries. Customer demand and market size have not been established.